Eléments de l'association
|
List of bibliographic references
Number of relevant bibliographic references: 101.Ident. | Authors (with country if any) | Title |
---|---|---|
002A81 | Susana Carrera [France] ; Wahiba Ramdane-Cherif [France] ; Marie-Claude Portmann [France] | Scheduling supply chain node with fixed component arrivals and two partially flexible deliveries |
002B16 | Susana Carrera [France] ; Wahiba Ramdane-Cherif [France] ; Marie-Claude Portmann [France] | Scheduling problems for logistic platforms with fixed staircase component arrivals and various deliveries hypotheses |
002E94 | Thibaud Monteiro [France] ; Marie-Claude Portmann [France] ; Smaïl Khouider [France] | Evaluation model framework based on simulation for enterprise network negotiation mechanisms |
003362 | Fatima Ghedjati ; Marie-Claude Portmann [France] | Dynamic heuristics for the generalized job-shop scheduling problem |
003553 | Susana Carrera [France] ; Marie-Claude Portmann [France] ; Wahiba Ramdane-Cherif [France] | Outils d'aide à la décision pour le lissage de charges des plateformes logistiques |
003706 | Ammar Oulamara [France] ; Marie-Claude Portmann [France] | ROADEF'09 - Livre des resumés |
003707 | Ammar Oulamara [France] ; Marie-Claude Portmann [France] | ROADEF'09 - Livre des articles |
004026 | Susana Carrera [France] ; Khalida Chami [France] ; Renato Guimaraes [France] ; Marie-Claude Portmann [France] ; Wahiba Ramdane-Cherif [France] | Negotiation models for logistic plarform planning and scheduling |
004038 | Wladyslaw Adam Janiak ; Adam Janiak ; Marie-Claude Portmann [France] | Single machine scheduling with job ready and delivery times subject to resource constraints |
004063 | Smaïl Khouider [France] ; Thibaud Monteiro [France] ; Marie-Claude Portmann [France] | Cadre de modélisation pour évaluation par simulation des mécanismes de négociation dans les entreprises en réseau |
004084 | Susana Carrera [France] ; Khalida Chami [France] ; Renato Guimaraes [France] ; Marie-Claude Portmann [France] ; Wahiba Ramdane Cherif [France] | Modèle linéaire pour le lissage de charge d'une plate forme logistique |
004133 | Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Project management and scheduling |
004158 | Julien Fondrevelle [France] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion times |
004565 | Marie-Claude Portmann [France] ; Antony Vignier | Genetic algorithms and scheduling. |
004575 | Ammar Oulamara [France] ; Marie-Claude Portmann [France] | European Journal of Operational Research : Special issue on "Project management and scheduling" |
004611 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] | A flexible proactive-reactive approach: the case of an assembly workshop |
004768 | Marie-Claude Portmann [France] ; Zerouk Mouloua [France] | A window time negotiation approach at the scheduling level inside supply chains |
004893 | Smaïl Khouider [France] ; Thibaud Monteiro ; Marie-Claude Portmann [France] | Outil de simulation pour l'évaluation des performances de coordination dans un réseau d'entreprises distribué |
004A03 | A. Milli ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Ordonnancement conjoint de la production et de la maintenance |
004C65 | Mohamed Ali Aloulou [France] ; Mikhail Y. Kovalyov [Biélorussie] ; Marie-Claude Portmann [France] | Evaluating flexible solutions in single machine scheduling via objective function maximization: the study of computational complexity |
004D85 | Marie-Claude Portmann [France] | Modèles de décision pour la conception et le pilotage des systèmes de production et/ou d'entreposage |
005109 | Smaïl Khouider [France] ; Thibaud Monteiro [France] ; Marie-Claude Portmann [France] | Gestion collaborative et distribuée des approvisionnements intégrant le transport |
005128 | Marie-Claude Portmann [France] | Modeling and decision tools for supply chain control |
005129 | Smaïl Khouider [France] ; Thibaud Monteiro [France] ; Marie-Claude Portmann [France] | Collaborative model for customer request ordering: research and selection of substitute suppliers |
005145 | Zérouk Mouloua [France] ; Marie-Claude Portmann [France] | Single product scheduling and transportation optimization in a supply chain |
005147 | Freddy Deppner [France] ; Marie-Claude Portmann [France] | A hybrid decomposition approach using increasing clusters for solving scheduling problems with minimal and maximal time lags |
005415 | Mikhail Y. Kovalyov [Biélorussie] ; Marie-Claude Portmann [France] ; Ammar Oulamara [France] | Optimal testing and repairing a failed series system |
005588 | Yuri N. Sotskov [Biélorussie] ; Alexandre Dolgui [France] ; Marie-Claude Portmann [France] | Stability analysis of an optimal balance for an assembly line with fixed cycle time |
005592 | Julien Fondrevelle [France] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Permutation flowshop scheduling problems with maximal and minimal time lags |
005A06 | Julien Fondrevelle [France] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Minimizing makespan in flowshop with time lags |
005A24 | Julien Fondrevelle [France] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Minimizing the weighted sum of machine completion times in flowshop with time lags |
005A97 | Henri Amet [France] ; Johanne Cohen [France] ; Freddy Deppner [France] ; Marie-Claude Portmann [France] ; Stéphane Rousseau | Un problème d'ordonnancement de messages : Partie 1 Modélisations ; Partie 2 Approches de résolution |
005A98 | Guillaume Thisselin ; Ammar Oulamara [France] ; Wahiba Ramdane-Cherif [France] ; Marie-Claude Portmann [France] | Méthodes d'optimisation combinatoire pour un problème d'optimisation de maintenance corrective |
005B01 | Julien Fondrevelle [France] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Approche de résolution pour les problèmes de flowshop avec time-lags minimaux et maximaux |
006351 | Adam Janiak [Pologne] ; Mikhail Y. Kovalyov [Biélorussie] ; Marie-Claude Portmann [France] | Single machine group scheduling with resource dependent setup and processing times : Logistics: From theory to application |
006487 | Julien Fondrevelle [France] ; Ali Allahverdi [Koweït] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Permutation flowshops with exact time lags to minimize maximum lateness |
006752 | Julien Fondrevelle [France] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Permutation Flowshop Scheduling Problems with Maximal and Minimal Time Lags |
006760 | Riad Aggoune [France] ; Marie-Claude Portmann [France] | Flow Shop Scheduling Problem with Limited Machine Availability: A Heuristic Approach |
006774 | Latifa Ouzizi [France] ; Didier Anciaux [France] ; Marie-Claude Portmann [France] ; François Vernadat [France] | A model for co-operative planning within a virtual enterprise |
006B74 | Mohamed Ali Aloulou [France] ; Mikhail Y. Kovalyov [Biélorussie] ; Marie-Claude Portmann [France] | Maximization Problems in Single Machine Scheduling |
006D49 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] | Une approche proactive réactive efficace : Cas d'un atelier d'assemblage |
006D89 | Christian Artigues [France] ; Philippe Baptiste [France] ; Jacques Carlier [France] ; Philippe Chrétienne [France] ; Christelle Guéret [France] ; Claire Hanen ; S. Kedah-Sidhoum ; Chams Lahlou [France] ; C. Lenté ; Alix Munier-Kordon ; Emmanuel Neron [France] ; C. Picouleau ; Eric Pinson ; Marie-Claude Portmann [France] ; C. Prins ; C. Proust ; D. Rivreau ; Francis Sourd | Modèles et Algorithmes en Ordonnancement: Exercices et Problèmes Corrigés |
006E11 | Latifa Ouzizi [France] ; Didier Anciaux [France] ; M. Chafai ; Marie-Claude Portmann [France] ; François Vernadat | Formalisation de la négociation pour la planification d'une entreprise virtuelle |
006E91 | Julien Fondrevelle [France] ; Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Scheduling unit time operation permutation flowshop with minimal time lags |
006F26 | Mikhail Y. Kovalyov ; Marie-Claude Portmann [France] ; Ammar Oulamara [France] | Optimal Testing and repairing a Failed series system |
007020 | Mohamed Ali Aloulou [France] ; Mikhail Y. Kovalyov [Portugal] ; Marie-Claude Portmann [France] | Evaluating flexible solutions in single machine scheduling via objective function maximization: the study of computional complexity |
007082 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] | An efficient proactive-reactive scheduling approach to hedge against shop floor disturbances |
007093 | Ammar Oulamara [France] ; Marie-Claude Portmann [France] | Abstracts of Ninth International Workshop On Project Management and Scheduling |
007152 | Didier Anciaux [France] ; Latifa Ouzizi [France] ; Marie-Claude Portmann [France] | Planification d'une chaîne logistique par négociation |
007153 | Guillaume Thisselin [France] ; Marie-Claude Portmann [France] | Méthode approchée pour le test et la réparation au moindre coût d'un système complexe en panne |
007206 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] | An efficient proactive reactive scheduling approach to hedge against shop floor disturbances |
007218 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] ; Mikhail Y. Kovalyov [Portugal] | Worst case performance evaluation of flexible solutions in single machine scheduling |
007260 | Riad Aggoune [France] ; Marie-Claude Portmann [France] | Flow Shop Scheduling Problem with Limited Machine Availability: A Heuristic Approach |
007261 | Guillaume Thisselin [France] ; Marie-Claude Portmann [France] | Exact Methods for Testing and Repairing a Failed Complex System with a Minimal Average Cost |
007262 | Latifa Ouzizi [France] ; Didier Anciaux [France] ; Marie-Claude Portmann [France] ; François Vernadat [France] | A model for co-operative planning within a virtual enterprise |
007436 | Yuri Sotskov ; Alexandre Dolgui [France] ; Marie-Claude Portmann [France] | Stability analysis of optimal balance for assembly line with fixed cycle time |
007C68 | Latifa Ouzizi [France] ; Didier Anciaux [France] ; Mohamed Chafai [Algérie] ; Marie-Claude Portmann [France] ; François Vernadat | Formalisation de la négociation pour la planification d'une entreprise virtuelle |
007D11 | Christelle Bloch ; Marie-Claude Portmann [France] ; Antony Vignier [France] | Application des algorithmes génétiques à l'ordonnancement de la production |
008064 | Riad Aggoune [France] ; Marie-Claude Portmann [France] | A heuristic approach for the job shop scheduling problem with availability constraints |
008072 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] ; Antony Vignier [France] | Predictive-Reactive Scheduling for the Single Machine Problem |
008074 | Marie-Claude Portmann [France] ; Mikhail Y. Kovalyov ; Henri Amet [France] | Dominance properties for permutation flow shop problems |
008079 | Riad Aggoune [France] ; Marie-Claude Portmann [France] | A New Heuristic for the Flow Shop Scheduling Problem with Availability Constraints |
008236 | Linet Ozdamar ; Sevket Ilker Birbil ; Marie-Claude Portmann [France] | Technical note: new results for the capacited lot sizing problem with overtime decisions and setup times |
008255 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] | A genetic algorithm to achieve scheduling flexibility for a single machine problem |
008974 | Christian Artigues [France] ; Cyril Briand [France] ; Marie-Claude Portmann [France] ; François Roubellat [France] | Pilotage d'atelier basé sur un ordonnancement flexible |
008A02 | Mohamed Ali Aloulou [France] ; Marc Sevaux [France] ; André Rossi ; Marie-Laure Espinouse ; Aziz Moukrim ; Antony Vignier [France] ; Bernard Penz ; Carl Esswein ; Christian Artigues ; Christophe Picouleau ; Christophe Thomas ; Stephane Dauzere-Peres ; Denis Trystram ; Emmanuel Neron ; Emmanuel Poder ; Eric Sanlaville ; Francis Sourd ; Marie-Claude Portmann [France] ; Jean-Charles Billaut | Flexibilité et Robustesse en Ordonnancement |
009420 | Daoud Ait-Kadi [France] ; JINSHENG GAO [France] ; Marie-Claude Portmann [France] | Minimisation des couts de detection de pannes a partir des coupes minimales du diagramme de fiabilite |
009494 | Daoud Ait-Kadi ; Jinsheng Gao ; Marie-Claude Portmann [France] | Minimisation des coûts de détection de pannes à partir des coupes minimales du diagramme de fiabilité |
009515 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] | Définition d'ordonnancements flexibles. Première application à un problème à une machine |
009525 | Marie-Claude Portmann [France] ; Antony Vignier [France] | Algorithmes génétiques et Ordonnancement |
009573 | Mohamed Ali Aloulou [France] ; Mikhail Y. Kovalyov ; Marie-Claude Portmann [France] | Single Machine Scheduling to Maximize Maximum Cost |
009574 | Adam Janiak ; Mikhail Y. Kovalyov ; Marie-Claude Portmann [France] | Single Machine Group Scheduling with Resource Dependent Setup and Processing Times |
009575 | Adam Janiak ; Mikhail Y. Kovalyov ; Marie-Claude Portmann [France] | Single Machine Group Scheduling with Resource Dependent Setup and Processing Times |
009576 | Adam Janiak ; Mikhail Y. Kovalyov ; Marie-Claude Portmann [France] | Single Machine Batch Scheduling with Controllable Setup and Processing Times |
009603 | Marie-Claude Portmann [France] ; Mohamed Ali Aloulou [France] | Population improvement with data oriented genetic operators |
009604 | Mikhail Y. Kovalyov ; Marie-Claude Portmann [France] ; Riad Aggoune [France] | Permutation Schedules Are Good For Realistic Flow Shop |
009619 | Mohamed Ali Aloulou [France] ; Mikhail Y. Kovalyov ; Marie-Claude Portmann [France] | Maximization Problems in Single Machine Scheduling |
009641 | Mohamed Ali Aloulou [France] ; Marie-Claude Portmann [France] | Incorporating flexibility in job sequencing for the single machine total weighted tardiness problem with release dates |
009650 | Riad Aggoune [France] ; Abdel Halim Mahdi [France] ; Marie-Claude Portmann [France] | Genetic Algorithms for the Flow Shop Scheduling Problem with availability constraints |
009667 | Marie-Claude Portmann [France] ; Mohamed Ali Aloulou [France] | Data oriented genetic operators for one-machine scheduling problems |
009771 | Marie-Claude Portmann [France] ; Antony Vignier [France] | Etude Comparative d'opérateurs de croisement pour un problème d'ordonnancement à une machine |
009947 | Abdel Halim Mahdi [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Genetic algorithms for the 2D placement |
009F76 | ABDEL HALIM MAHDI [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Algorithmes génétiques pour la résolution d'un problème de découpe 2D |
009F91 | ABDEL HALIM MAHDI [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Genetic algorithms for the 2D placement |
00A101 | Abdel Halim Mahdi [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Algorithmes Génétiques pour la résolution d`un problème de découpe 2D |
00A163 | Marie-Claude Portmann [France] ; Antony Vignier [France] | Performances Study on crossover operators keeping good schemata for some scheduling problems |
00A180 | Abdel Halim Mahdi [France] ; Gülgün Alpan [France] ; Marie-Claude Portmann [France] | New data oriented genetic operators for solving Flowshop problems having tardiness criteria |
00A216 | Abdel Halim Mahdi [France] ; Gülgün Alpan [France] ; Marie-Claude Portmann [France] | Genetic algorithms with Data Oriented Operators to Solve Flow Shop Problems having Tardiness Criteria |
00A220 | Antony Vignier [France] ; Marie-Claude Portmann [France] | Flexibility Versus Performances |
00AC58 | Abdel Halim Mahdi [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Physical layout with minimization of the transport costs |
00AC93 | Lamia Djerid [France] ; Marie-Claude Portmann [France] | How to keep good schemata using cross-over operators for permutation problems |
00AC94 | Lamia Djerid [France] ; Marie-Claude Portmann [France] | How to keep good schemata using cross-over operators for permutation problems |
00AC97 | Abdel Halim Mahdi [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Genetic algorithms for the 2D cutting problem |
00AC98 | Abdel Halim Mahdi [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Genetic algorithm for solving the physical facility layout |
00AC99 | Abdel Halim Mahdi [France] ; Henri Amet [France] ; Marie-Claude Portmann [France] | Genetic Algorithms for Solving a Physical Facility Layout Problem |
00AD00 | Antony Vignier [France] ; Abdel Halim Mahdi [France] ; Marie-Claude Portmann [France] | Genetic Algorithm for flowshop scheduling problem using data oriented operators |
00AD61 | Antony Vignier [France] ; Benoit Sonntag [France] ; Marie-Claude Portmann [France] | A hybrid method for a parallel machine scheduling problem |
00AD63 | Antony Vignier [France] ; Benoit Sonntag [France] ; Marie-Claude Portmann [France] | A decomposition Method based on priority rules for a parallel-machine scheduling problem |
00AF02 | Adam Janiak [France] ; Marie-Claude Portmann [France] | Genetic Algorithm for the Permutation Flow-shop Scheduling Problem with Linear Models of Operations |
00B621 | Lionel Dupont ; Antony Vignier [France] ; Marie-Claude Portmann [France] ; Christian Proust | New Separation Scheme for Hybrid Flowshop |
00B699 | Antony Vignier [France] ; Sven Wagner [France] ; Marie-Claude Portmann [France] | Alternative Assignment and Sequencing on 2-Parallel Machine problem under constraints |
This area was generated with Dilib version V0.6.33. |